PMP ITTO Chart Input, Tools & Technique, Output for each process forms the basis for PMBOK. Here are all the ITTO for all 42 Processes in PMBOK4.
Integration Management Initiation Project Charter Input Project Statement of work Business case Contract Enterprise environmental factors Organizational process assets Tools & Techniques Expert judgement Output Project Charter
Planning Develop Project Management Plan Inputs Project charter Outputs from planning processes Enterprise environmental factors Organizational process assets Tools & Technique Expert judgement
Output Project Management Plan
Executing Direct and Manage Project Execution Inputs Project management plan Approved change requests Enterprise Environmental factors Organizational Process Assets Tools & Techniques Expert judgement Project management information system Outputs Deliverable Work performance information Change requests Project Management Plan Updates Project document updates
Monitoring & Controlling Monitor and Control Project Work Inputs Project management plan Performance reports Enterprise environmental factors Organizational process assets Tools & Techniques Expert judgement
Outputs Change requests Project management plan updates Project document updates
Perform Integrated Change Control Inputs Project management plan Work performance information Change requests Enterprise environmental factors Organizational process assets Tools & Techniques Expert judgement Change control meetings Outputs Change request status updates Project management plan updates Project document updates
Closing Close Project or Phase Inputs Project management plan Accepted deliverables Organizational process assets Tools & Techniques Expert judgement Outputs Final product, service or result transition Organizational process assets updates
Scope Management Planning Collect Requirement Inputs Project charter Stakeholder register Tools & Techniques Interviews Focus groups Facilitated workshops Group creativity techniques Group decision-making techniques Questionnaires and surveys Observations Prototypes Outputs Requirements documentation Requirements management plan Requirements traceability matrix
Define Scope Inputs Project charter Requirements documentation Organizational process assets Tools & Techniques Expert judgement Product analysis Alternative identification Facilitated workshops
Outputs Project scope statement Project document updates
Create WBS Inputs Project Scope Statement Requirements documentation Organizational process assets Tools & Techniques Decomposition Outputs WBS WBS dictionary Scope baseline Project document updates
Monitoring & Controlling Verify Scope Inputs Project management plan Requirements documentation Requirements traceability matrix Validated deliverables Tools & Techniques Inspection Outputs Accepted Deliverable Change requests Project document updates
Control Scope Inputs Project management plan Work Performance Information Requirements documentation Requirements traceability matrix Organizational process assets Tools & Techniques Variance analysis Outputs Work performance measurements Organizational process assets updates Change requests Project management plan updates Project document updates
Time Management Planning Define Activities Inputs Scope baseline Enterprise environmental factors Organizational process assets Tools and Techniques Decomposition Rolling wave planning Templates Expert judgement Outputs Activity list
Activity attributes Milestone list
Sequence Activities Inputs Activity List Activity attributes Milestone list Project scope statement Organizational process assets Tools and Techniques Precedence diagram method (PDM) Dependency determination Applying leads and lags Schedule Network Templates Outputs Project schedule network diagrams Project document updates
Estimate Activity Resources Inputs Activity List Activity attributes Resource calendars Enterprise environmental factors Organizational process assets Tools and Techniques Expert judgement Alternative analysis Published estimating data Bottom-up estimating Project Management software
Outputs Activity resource requirements Resource breakdown structure Project document updates
Estimate Activity Durations Inputs Activity list Activity attributes Activity resource requirements Resource calendars Project scope statement Enterprise environmental factors Organizational process assets Tools and Techniques Expert judgement Analogous estimating Parametric estimating Three-point estimates Reserve analysis Outputs Activity duration estimates Project document updates
Develop Schedule Inputs Activity List Activity attributes Project Schedule Network diagram Activity Resource requirements Resource Calendars Activity duration estimates Project scope statement
Enterprise Environmental Factors Organizational process assets Tools and Techniques Schedule network analysis Critical path method Critical chain method Resource levelling What-if scenario analysis Applying leads and lags Schedule Compression Scheduling tool Outputs Project Schedule Schedule baseline Schedule data Project document updates
Monitoring & Controlling Control Schedule Inputs Project management plan Project schedule Work performance information Organizational process assets Tools and Techniques Performance reviews Variance analysis Project management software Resource levelling What-if scenario analysis Adjusting leads and lags
Schedule compression Scheduling tool Outputs Work performance measurements Organizational process assets updates Change requests Project management plan updates Project document updates
Cost Management Planning Estimate Costs Input Scope Baseline Project Schedule HR Plan Risk Register Enterprise Environmental Factors Organizational Process assets Tools & Techniques Expert Judgement Analogous Estimate Parametric Estimate Bottom-Up Estimate Three-Point Estimate Reserve Analysis Cost Of Quality Project Management Estimating Software Vendor Bid Analysis Outputs Activity Cost Estimate
Basis of Estimates Project Document updates
Determine Budget Input Activity Cost Estimates Basis of Estimate Scope Baseline Project Schedule Resource Calendars Contracts Organizational Process Assets Tools & Techniques Cost Aggregation Reserve Analysis Expert Judgement Historical relationships Funding limit reconciliation Outputs Cost Performance Baseline Project Funding requirements Project document updates
Monitoring & Controlling Control Costs Input Project management Plan Project funding requirements Work Performance information Organizational Process assets
Tools & Techniques Earned Value management Forecasting To-complete performance index (TCPI) Performance reviews Variance analysis Project Management software Outputs Work performance measurements Budget forecast Organizational process assets updates Change request Project management plan updates Project document updates
Quality Management Planning Plan Quality Inputs Scope baseline Stakeholder register Cost performance baseline Schedule baseline Risk register Enterprise environmental factors Organizational Process assets Tools and Techniques Cost-benefit analysis Cost of quality Control charts Benchmarking Design of experiments
Statistical sampling Flow charting Proprietary quality management methodology Additional quality planning tools Outputs Quality management plan Quality metrics Quality checklists Process improvement plan Project document updates
Executing Perform Quality Assurance Inputs Project management plan Quality metrics Work performance information Quality control measurements Tools and Techniques Plan Quality and Perform Quality Control tools and techniques Quality audits Process analysis Outputs Organizational process updates Change requests Project management plan updates Project document updates
Monitoring & Controlling Perform Quality Control
Inputs Project management plan Quality metrics Quality checklists Work performance measurements Approved change requests Deliverable Organizational process assets Tools and Techniques Cause and effect diagram Control charts Flow charting Histogram Pareto chart Run chart Scatter diagram Statistical Sampling Inspection Approved change requests review Outputs Quality control measurements Validated changes Validated deliverables Organizational process assets updates Change requests Project management plan updates Project document updates
HR Management Planning Develop HR Plan
Inputs Activity resource requirements Enterprise environmental factors Organizational process assets Tools and Techniques Organization charts and position descriptions Networking Organizational Theory Outputs Human resource plan
Executing Acquire Project Team Inputs Project management plan Enterprise environmental factors Organizational process assets Tools and Techniques Pre-assignment Negotiation Acquisition Virtual teams Outputs Project staff assignments Resource calendars Project management plan updates
Develop Project Team Inputs Project staff assignment
Project management plan Resource calendars Tools and Techniques Interpersonal skills Training Team-building activities Ground rules Co-location Recognition and rewards Outputs Team performance assessments Enterprise environmental factors updates
Manage Project Team Inputs Project staff assignments Project management plan Team performance assets Performance reports Organizational process assets Tools and Techniques Observation and conversation Project performance appraisals Conflict management Issue log Interpersonal skills Outputs Enterprise environmental factors updates Organizational process assets updates Change requests Project management plan updates
Communication Management Initiation Identify Stakeholders Inputs Project Charter Procurement documents Enterprise environmental factors Organizational process assets Tools & Techniques Stakeholder analysis Expert judgement Outputs Stakeholder register Stakeholder management strategy
Planning Plan Communications Inputs Stakeholder register Stakeholder management strategy Enterprise environmental factors Organizational process assets Tools & Techniques Communication requirements analysis Communication technology Communication models Communication methods
Outputs Communications management plan Project document updates
Executing Distribute Information Inputs Project management plan Performance reports Organizational process assets Tools & Techniques Communication methods Information distribution tools Outputs Organizational process assets updates
Manage Stakeholder Expectation Inputs Stakeholder register Stakeholder management strategy Project management plan Issue log Change log Organizational process assets Tools & Techniques Communication methods Interpersonal skills Management skills Outputs Organizational process assets updates Change requests
Project management plan updates Project document updates
Monitoring & Controlling Report Performance Inputs Project Management Plan Work performance information Work performance measurements Budget forecasts Organizational process assets Tools & Techniques Variance analysis Forecasting methods Communication methods Reporting systems Outputs Performance reports Organizational process assets updates Change requests
Risk Management Planning Plan Risk Management Input Project Scope Management Cost management plan Schedule management plan Communication management plan Enterprise environmental factors Organizational process assets
Tools & Techniques Planning meetings & analysis Output Risk Management plan
Identify Risks Input Risk Management plan Activity Cost Estimates Activity duration estimates Scope Baseline Stakeholder register Cost Management plan Schedule Management plan Quality Management plan Project documents Enterprise environmental factors Organizational Process assets Tools & Techniques Documentation reviews Information gathering technique Checklist analysis Assumptions analysis Diagramming techniques SWOT analysis Expert judgement Output Risk register
Perform Qualitative Risk Management Input Risk register
Risk Management plan Project scope statement Organizational process assets Tools & Techniques Risk probability and impact assessment Probability and impact assessment Risk data quality assessment Risk categorization Risk urgency assessment Expert judgement Output Risk register updates
Perform Quantitative Risk Management Input Risk register Risk Management Plan Cost Management plan Schedule Management plan Organizational Process assets Tools & Techniques Data gathering and representative techniques Quantitative risk analysis and modelling techniques Expert Judgement Output Risk register updates
Plan Risk Responses Input Risk register Risk Management Plan
Tools & Techniques Strategies for negative risks or threats Strategies for positive risks or opportunities Contingent response strategies Expert judgement Output Risk register updates Risk-related contract decisions Project management plan updates Project document updates
Monitoring & Controlling Monitor & Control Risks Input Risk register Project management plan Work performance information Performance reports Tools & Techniques Risk assessment Risk audits variance and trend analysis Technical performance measurement Reserve analysis Status meetings Output Risk register updates Organizational Process assets updates Change requests Project management plan updates Project document updates
Procurement Management Planning Plan Procurements Inputs Scope baseline Requirements documentation Teaming agreements Risk register Risk-related contract decisions Activity resource requirements Project schedule Activity cost estimates Cost performance baseline Enterprise environmental factors Organizational process assets Tools and Techniques Make-or-buy analysis Expert judgement Contract types Outputs Procurement management plan Procurement statements of work Make-or-buy decisions Procurement documents Source selection criteria Change requests
Executing Conduct Procurements
Inputs Project Management Plan Procurement documents Source Selection criteria Qualified seller list Seller proposals Project documents Make-or-buy decisions Teaming agreements Organizational process assets Tools and Techniques Bidder conferences Proposal evaluation techniques Independent estimates Expert judgement Advertising Internet search Procurement negotiations Outputs Selected sellers Procurement contract award Resource calendars Change requests Project management plan updates Project document updates
Monitoring & Controlling Administer Procurements Inputs Procurement documents Project management plan Contract Performance reports
Approved change requests Work performance information Tools and Techniques Contract change control system Procurement performance reviews Inspection and audits Performance reporting Payment systems Claims administration Records management system Outputs Procurement documentation Organizational process assets updates Change requests Project management plan updates
Closing Close Procurements Inputs Project management plan Procurement documentation Tools and Techniques Procurement audits Negotiated settlements Records management system Outputs Closed procurements Organizational process updates
Integration Management Initiation Project Charter Input Project Statement of work Business case Contract Enterprise environmental factors Organizational process assets Tools & Techniques Expert judgement Output Project Charter
Planning Develop Project Management Plan Inputs Project charter Outputs from planning processes Enterprise environmental factors Organizational process assets Tools & Technique Expert judgement
Output Project Management Plan
Executing Direct and Manage Project Execution Inputs Project management plan Approved change requests Enterprise Environmental factors Organizational Process Assets Tools & Techniques Expert judgement Project management information system Outputs Deliverable Work performance information Change requests Project Management Plan Updates Project document updates
Monitoring & Controlling Monitor and Control Project Work Inputs Project management plan Performance reports Enterprise environmental factors Organizational process assets Tools & Techniques Expert judgement
Outputs Change requests Project management plan updates Project document updates
Perform Integrated Change Control Inputs Project management plan Work performance information Change requests Enterprise environmental factors Organizational process assets Tools & Techniques Expert judgement Change control meetings Outputs Change request status updates Project management plan updates Project document updates
Closing Close Project or Phase Inputs Project management plan Accepted deliverables Organizational process assets Tools & Techniques Expert judgement Outputs Final product, service or result transition Organizational process assets updates
Scope Management Planning Collect Requirement Inputs Project charter Stakeholder register Tools & Techniques Interviews Focus groups Facilitated workshops Group creativity techniques Group decision-making techniques Questionnaires and surveys Observations Prototypes Outputs Requirements documentation Requirements management plan Requirements traceability matrix
Define Scope Inputs Project charter Requirements documentation Organizational process assets Tools & Techniques Expert judgement Product analysis Alternative identification Facilitated workshops
Outputs Project scope statement Project document updates
Create WBS Inputs Project Scope Statement Requirements documentation Organizational process assets Tools & Techniques Decomposition Outputs WBS WBS dictionary Scope baseline Project document updates
Monitoring & Controlling Verify Scope Inputs Project management plan Requirements documentation Requirements traceability matrix Validated deliverables Tools & Techniques Inspection Outputs Accepted Deliverable Change requests Project document updates
Control Scope Inputs Project management plan Work Performance Information Requirements documentation Requirements traceability matrix Organizational process assets Tools & Techniques Variance analysis Outputs Work performance measurements Organizational process assets updates Change requests Project management plan updates Project document updates
Time Management Planning Define Activities Inputs Scope baseline Enterprise environmental factors Organizational process assets Tools and Techniques Decomposition Rolling wave planning Templates Expert judgement Outputs Activity list
Activity attributes Milestone list
Sequence Activities Inputs Activity List Activity attributes Milestone list Project scope statement Organizational process assets Tools and Techniques Precedence diagram method (PDM) Dependency determination Applying leads and lags Schedule Network Templates Outputs Project schedule network diagrams Project document updates
Estimate Activity Resources Inputs Activity List Activity attributes Resource calendars Enterprise environmental factors Organizational process assets Tools and Techniques Expert judgement Alternative analysis Published estimating data Bottom-up estimating Project Management software
Outputs Activity resource requirements Resource breakdown structure Project document updates
Estimate Activity Durations Inputs Activity list Activity attributes Activity resource requirements Resource calendars Project scope statement Enterprise environmental factors Organizational process assets Tools and Techniques Expert judgement Analogous estimating Parametric estimating Three-point estimates Reserve analysis Outputs Activity duration estimates Project document updates
Develop Schedule Inputs Activity List Activity attributes Project Schedule Network diagram Activity Resource requirements Resource Calendars Activity duration estimates Project scope statement
Enterprise Environmental Factors Organizational process assets Tools and Techniques Schedule network analysis Critical path method Critical chain method Resource levelling What-if scenario analysis Applying leads and lags Schedule Compression Scheduling tool Outputs Project Schedule Schedule baseline Schedule data Project document updates
Monitoring & Controlling Control Schedule Inputs Project management plan Project schedule Work performance information Organizational process assets Tools and Techniques Performance reviews Variance analysis Project management software Resource levelling What-if scenario analysis Adjusting leads and lags
Schedule compression Scheduling tool Outputs Work performance measurements Organizational process assets updates Change requests Project management plan updates Project document updates
Cost Management Planning Estimate Costs Input Scope Baseline Project Schedule HR Plan Risk Register Enterprise Environmental Factors Organizational Process assets Tools & Techniques Expert Judgement Analogous Estimate Parametric Estimate Bottom-Up Estimate Three-Point Estimate Reserve Analysis Cost Of Quality Project Management Estimating Software Vendor Bid Analysis Outputs Activity Cost Estimate
Basis of Estimates Project Document updates
Determine Budget Input Activity Cost Estimates Basis of Estimate Scope Baseline Project Schedule Resource Calendars Contracts Organizational Process Assets Tools & Techniques Cost Aggregation Reserve Analysis Expert Judgement Historical relationships Funding limit reconciliation Outputs Cost Performance Baseline Project Funding requirements Project document updates
Monitoring & Controlling Control Costs Input Project management Plan Project funding requirements Work Performance information Organizational Process assets
Tools & Techniques Earned Value management Forecasting To-complete performance index (TCPI) Performance reviews Variance analysis Project Management software Outputs Work performance measurements Budget forecast Organizational process assets updates Change request Project management plan updates Project document updates
Quality Management Planning Plan Quality Inputs Scope baseline Stakeholder register Cost performance baseline Schedule baseline Risk register Enterprise environmental factors Organizational Process assets Tools and Techniques Cost-benefit analysis Cost of quality Control charts Benchmarking Design of experiments
Statistical sampling Flow charting Proprietary quality management methodology Additional quality planning tools Outputs Quality management plan Quality metrics Quality checklists Process improvement plan Project document updates
Executing Perform Quality Assurance Inputs Project management plan Quality metrics Work performance information Quality control measurements Tools and Techniques Plan Quality and Perform Quality Control tools and techniques Quality audits Process analysis Outputs Organizational process updates Change requests Project management plan updates Project document updates
Monitoring & Controlling Perform Quality Control
Inputs Project management plan Quality metrics Quality checklists Work performance measurements Approved change requests Deliverable Organizational process assets Tools and Techniques Cause and effect diagram Control charts Flow charting Histogram Pareto chart Run chart Scatter diagram Statistical Sampling Inspection Approved change requests review Outputs Quality control measurements Validated changes Validated deliverables Organizational process assets updates Change requests Project management plan updates Project document updates
HR Management Planning Develop HR Plan
Inputs Activity resource requirements Enterprise environmental factors Organizational process assets Tools and Techniques Organization charts and position descriptions Networking Organizational Theory Outputs Human resource plan
Executing Acquire Project Team Inputs Project management plan Enterprise environmental factors Organizational process assets Tools and Techniques Pre-assignment Negotiation Acquisition Virtual teams Outputs Project staff assignments Resource calendars Project management plan updates
Develop Project Team Inputs Project staff assignment
Project management plan Resource calendars Tools and Techniques Interpersonal skills Training Team-building activities Ground rules Co-location Recognition and rewards Outputs Team performance assessments Enterprise environmental factors updates
Manage Project Team Inputs Project staff assignments Project management plan Team performance assets Performance reports Organizational process assets Tools and Techniques Observation and conversation Project performance appraisals Conflict management Issue log Interpersonal skills Outputs Enterprise environmental factors updates Organizational process assets updates Change requests Project management plan updates
Communication Management Initiation Identify Stakeholders Inputs Project Charter Procurement documents Enterprise environmental factors Organizational process assets Tools & Techniques Stakeholder analysis Expert judgement Outputs Stakeholder register Stakeholder management strategy
Planning Plan Communications Inputs Stakeholder register Stakeholder management strategy Enterprise environmental factors Organizational process assets Tools & Techniques Communication requirements analysis Communication technology Communication models Communication methods
Outputs Communications management plan Project document updates
Executing Distribute Information Inputs Project management plan Performance reports Organizational process assets Tools & Techniques Communication methods Information distribution tools Outputs Organizational process assets updates
Manage Stakeholder Expectation Inputs Stakeholder register Stakeholder management strategy Project management plan Issue log Change log Organizational process assets Tools & Techniques Communication methods Interpersonal skills Management skills Outputs Organizational process assets updates Change requests
Project management plan updates Project document updates
Monitoring & Controlling Report Performance Inputs Project Management Plan Work performance information Work performance measurements Budget forecasts Organizational process assets Tools & Techniques Variance analysis Forecasting methods Communication methods Reporting systems Outputs Performance reports Organizational process assets updates Change requests
Risk Management Planning Plan Risk Management Input Project Scope Management Cost management plan Schedule management plan Communication management plan Enterprise environmental factors Organizational process assets
Tools & Techniques Planning meetings & analysis Output Risk Management plan
Identify Risks Input Risk Management plan Activity Cost Estimates Activity duration estimates Scope Baseline Stakeholder register Cost Management plan Schedule Management plan Quality Management plan Project documents Enterprise environmental factors Organizational Process assets Tools & Techniques Documentation reviews Information gathering technique Checklist analysis Assumptions analysis Diagramming techniques SWOT analysis Expert judgement Output Risk register
Perform Qualitative Risk Management Input Risk register
Risk Management plan Project scope statement Organizational process assets Tools & Techniques Risk probability and impact assessment Probability and impact assessment Risk data quality assessment Risk categorization Risk urgency assessment Expert judgement Output Risk register updates
Perform Quantitative Risk Management Input Risk register Risk Management Plan Cost Management plan Schedule Management plan Organizational Process assets Tools & Techniques Data gathering and representative techniques Quantitative risk analysis and modelling techniques Expert Judgement Output Risk register updates
Plan Risk Responses Input Risk register Risk Management Plan
Tools & Techniques Strategies for negative risks or threats Strategies for positive risks or opportunities Contingent response strategies Expert judgement Output Risk register updates Risk-related contract decisions Project management plan updates Project document updates
Monitoring & Controlling Monitor & Control Risks Input Risk register Project management plan Work performance information Performance reports Tools & Techniques Risk assessment Risk audits variance and trend analysis Technical performance measurement Reserve analysis Status meetings Output Risk register updates Organizational Process assets updates Change requests Project management plan updates Project document updates
Procurement Management Planning Plan Procurements Inputs Scope baseline Requirements documentation Teaming agreements Risk register Risk-related contract decisions Activity resource requirements Project schedule Activity cost estimates Cost performance baseline Enterprise environmental factors Organizational process assets Tools and Techniques Make-or-buy analysis Expert judgement Contract types Outputs Procurement management plan Procurement statements of work Make-or-buy decisions Procurement documents Source selection criteria Change requests
Executing Conduct Procurements
Inputs Project Management Plan Procurement documents Source Selection criteria Qualified seller list Seller proposals Project documents Make-or-buy decisions Teaming agreements Organizational process assets Tools and Techniques Bidder conferences Proposal evaluation techniques Independent estimates Expert judgement Advertising Internet search Procurement negotiations Outputs Selected sellers Procurement contract award Resource calendars Change requests Project management plan updates Project document updates
Monitoring & Controlling Administer Procurements Inputs Procurement documents Project management plan Contract Performance reports
Approved change requests Work performance information Tools and Techniques Contract change control system Procurement performance reviews Inspection and audits Performance reporting Payment systems Claims administration Records management system Outputs Procurement documentation Organizational process assets updates Change requests Project management plan updates
Closing Close Procurements Inputs Project management plan Procurement documentation Tools and Techniques Procurement audits Negotiated settlements Records management system Outputs Closed procurements Organizational process updates
Process Chart which has been provided in the PMP. Output of Develop Project Management Plan is “Project management plan”. ITTO for all such processes are. If you ask any PMP aspirant about the scariest questions on the PMP exam, you will most likely get the same answer. Yes, these are ITTO based questions. ITTO stands for Input, Tools & Techniques, and Output. Almost all PMP aspirants are scared of ITTO-based questions, and they try to find the easiest way to solve them. An incredibly powerful PMBOK ITTO chart and learning tool to master the 1452 Inputs, Tools and Techniques and Outputs (ITTO) for PMP ® and CAPM ® based on PMBOK ® Guide, 6th Ed without memorization. The usual slow, boring and painful process of flipping through the 800-pg Guide comes to life with the ITTO Explorer. Preparing a PMP ITTO chart (summary spreadsheet) and flashcards are two excellent ways to use 'writing to learn' to bolster your preparation for the exam. Learning the PMP ITTO is a significant undertaking, but with a solid commitment to studying and learning, a study plan developed by you for your personal circumstances, and diligent effort. A bar chart showing a distribution of variables. Show trends in the variation of a process over time. Scatter diagram. Shows the relationship between two variables. Control chart. A graphic display of process data over time and against established control limits, and that has a centerline that assists in detecting a trend of plotted.
How to remember ITTOs of Integration management? ITTO is an acronym that stands for Inputs, Tools and Techniques, and Outputs.
![How to remember itto pmp How to remember itto pmp](https://image.isu.pub/180411080843-7637de2bc9e571876b65a2cf2fa018b9/jpg/page_1.jpg)
Do we need memorize ITTOs for all the 49 project management processes included in PMBOK Guide, Sixth Edition? I believe it’s a never ending debate, ever since the PMBOK Guide and PMP certification examination came into existence.
Should you memorize them all? Why not? If you can memorize ITTOs for all the 49 processes, please go ahead by all means. If you can memorize them all, it is NOT necessary for you to read the rest of this article. This article is written with an aim to help those candidates who cannot memorize all the ITTOs.
To be honest, there was a possibility to memorize ITTOs until PMBOK Guide Fourth Edition or even until PMBOK Guide Fifth Edition. I personally feel, PMBOK Guide Sixth Edition has certainly made it near impossible to memorize ITTOs. The sheer number of inputs, tools and techniques and outputs for each process would certainly be beyond normal humans’ capability to memorize them.
The only way out, in my opinion, is to understand what is happening in each process. Then, try to use logic, common sense and your project management experience to figure out what could be the appropriate ITTOs for a given process.
Hindi typing master pc software, free download. In this attempt, I found the approach of drawing the process flow of each knowledge area helps very much in understanding and remembering the Inputs and Outputs.
![Pmp Pmp](https://cdn.slidesharecdn.com/ss_thumbnails/allinone-120102034149-phpapp02-thumbnail-4.jpg?cb=1370919054)
I have given the process flow for Project Integration Management below. I have included ONLY the major inputs and outputs, so that it is easier to understand rather than complicating it too much. Please note that it does NOT include ALL inputs and outputs. I have included only those inputs and outputs, which I felt as important.
My advice to you is to draw the above process flow diagram yourself. You might choose to include more inputs and outputs; or even some of the tools and techniques. It would help your mind to map the inputs, tools and techniques and outputs to the processes; and you would not forget it.
This may not be an exhaustive list. But, I am just giving you some of the tips which I think would be useful to you. Boost excel add in for mac.
Pmp Itto Process Chart
How To Remember Itto Pmp
- Organizational Process Assets is an input to all the 7 processes of Project Integration Management.
- Expert Judgment is a Tool & Technique used in all the 7 processes of Project Integration Management.
- Enterprise Environmental Factors is an input to 6 processes of Project Integration Management (the only exception is Close Project or Phase process).
- Once Project Management Plan is developed in 4.2 Develop Project Management Plan process, it becomes an input to all the remaining 47 processes in this knowledge area. Only Develop Project Charter process does not involve project management plan, neither as an input nor as an output.
- Change requests is an output of 24 processes; but it is an input only to one process.
- Change requests can be an input only to Perform Integrated Change Control. It means, wherever a change request is generated, it will be sent to Perform Integrated Change Control process for further review.
- Approved change requests can be an output of only Perform Integrated Change Control process. None of the other 48 processes can have Approved change requests as an output. This is obvious because all change requests generated in the project have to be reviewed only through the Perform Integrated Change Control process. So, only this process can approve change requests.
- For all Monitoring & Controlling processes, change requests is an output; the only exception is Perform Integrated Change Control. In this process, change requests is an input and Approved change requests is an output.
What is your approach to remember ITTOs in Project Integration Management? Do you think the above approach is good? Do you have any other tips you want me to include in the above list?
Would you be interested in similar process flow charts for other knowledge areas too?
Itto Chart Pmp 6th Edition
Share your opinions, comments and criticism in the comments below.